Photo

1. Ongoing project:

  1. Synthesis and Characterization of ODS steels using alternative dispersoid , BRNS, 2017-2019, 31.0 Lakhs- External member

2. Completed project:

As Principal Investigator

  • Processing of Oxide Dispersion Strengthened Ferritic Steel Powder by High Energy Ball Milling and its Characterization, BRNS, (DAE), 2010 to 13. 67.5, Lakhs
  • Thermal plasma dissociation of molybdenite for the production of molybdenum metal, Ministry of Mines, , 2010 to 13- 33.0 Lakhs
  • Production of Ferro-Nickel from Chromite Overburden (COB) and Nickel Laterite ore by Thermal Plasma Process Ministry of Mines, , 2011 to 14 – 41.0 Lakhs
  • Very High Power Microwave Tubes: Design and Development Capabilities, [12 FYP] CSIR Network project, 2012 to 17- 234.00 Lakhs
  • Environmental Research Initiative for paper and process industry, [12 FYP] CSIR Network project, 2012 to 17- 100.00 Lakhs
  • Smelting studies on recovery of metal values from chromium leach residue, M/s Vishnu Chemicals Ltd, Visakhapatnam., Aug 2015 to Jan 2016 – 10.26 Lakhs
  • Co- Principal Investigator:

  • Novel Approach for Processing Hazardous Electronic Waste (Indo-Australian joint Project)-Collaboration with UNSW, Sydney. IIT Delhi and IIT Roorkee DST , New Delhi 2012 to 16 – 81.00, Lakhs
  • Development of process for making value added materials from Ti bearing slags Ministry of Mines, 2014 – 17, 24.90 Lakhs
  • Development of Nickel Containing Steel from Chromite Over Burden jointly with IIT, Kharagpur, Ministry of Mines, 2015 – 18, 50.81, Lakhs, (ongoing)
    As Member

  • Development of Tungsten Alloy Cube and its characterization DRDL (DRDO) 2015 to 17 – 17.94 Lakhs
  • An investigation on treatment of bauxite through hydrogen plasma NALCO 2016 to 16 – 10.00 Lakhs
  • Synthesis of magnetite from blue dust and iron ore tailings SERB (DST) 2012 to 16 – 21.90 Lakhs
  • Design & Development of environmentally secure rare earth based colorants for surface coating applicationsCSIR-NMITLI, 2005 to 08 – 43.00 Lakhs
  • Inflight processing of metallised ilmenite in a dc plasma furnace for continuous production of titania rich slag and pig iron Indian Rare Earths Limited (IREL) 2007 to 11 – 70.00 Lakhs
  • Utilization of Red Mud for Recovery of Iron Metal and Slag leading to Zero Waste, M/s Vedanta Ltd, Langigarh, Odisha 2010 to 11, 37.00 Lakhs
  • Thermal plasma melting studies of e-waste for recovery of metal values, M/s J.A.Aronan (Earthsense Recycle Pvt Ltd), 2010 to 11, 5.5, Lakhs
  • Plasma Smelting of Red mud for the Production of Pig iron/Cast iron and Alumina rich Slag NALCO, Bhubaneswar 2008 to 10, 13.92 Lakhs
  • Process for direct production of pig iron from iron ore fines using thermal plasma route , Ministry of Steel 2010 to 12 – 43.88 Lakhs